Skip to main content

NASA chooses a CubeSat project to test orbit route around the moon

Illustration of the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE). Tyvak Nano-Satellite Systems

NASA’s ambitious Gateway program aims to send four astronauts to an outpost in orbit around the moon by 2025, following the Artemis mission and creating a staging area for eventual exploration of Mars and beyond. But before any manned missions can happen, a safe and stable orbit needs to be chosen. To that end, NASA has awarded a contract to the Advanced Space company to send a small satellite into the orbit planned for Gateway.

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) craft will be a CubeSat, a small satellite made of twelve 10 x 10 x 10cm cube-shaped units, that will be sent into what is called a “near rectilinear halo orbit” around the moon. That means the satellite will sometimes be as close as 1,000 miles from the surface of the moon, and at other times be as far away as 43,5000 miles.

Recommended Videos

Highly elliptical, a near rectilinear halo orbit around the Moon takes advantage of a precise balance point in the gravities of Earth and the Moon and creates stability that is ideal for long-term missions like Gateway. Credit: Advanced Space
The particular orbit chosen is a seven-day cycle, coming close to the moon once per week. It uses the gravity of both the moon and the Earth, finding a balance point where the craft is caught by the gravity of both bodies, which makes it very stable for a period of years. It’s called a halo orbit because from Earth it will look like a halo around the moon.

Please enable Javascript to view this content

NASA is hoping to save time and money by combining the testing of the orbit with other functions like navigation system testing. “CAPSTONE offers a lot in a small package,” Advanced Space CEO Bradley Cheetham said in a statement. “Not only will it serve as a pathfinder for Artemis, but it will also demonstrate key exploration-enabling commercial capabilities. Our team will be pioneering state-of-the-art tools for mission planning and operations to enable growth in the number of future missions to the Moon, Mars, and throughout the solar system.”

CAPSTONE could be launched in a number of ways, including being the main payload from a launch vehicle. It will take three months after launch for it to enter its orbit, then it will spend six months collecting data in a demonstration phase.

Georgina Torbet
Georgina has been the space writer at Digital Trends space writer for six years, covering human space exploration, planetary…
Stunning NASA images show next-gen moon rocket on launchpad
NASA's mega moon rocket on the launchpad at the Kennedy Space Center.

NASA has shared some stunning images of its next-generation Space Launch System (SLS) rocket on the launchpad.

Previous

Read more
NASA looks beyond SpaceX for future lunar landers
An illustration showing astronauts on the moon.

NASA has announced it’s welcoming lunar lander concepts from commercial companies other than SpaceX, which already has a contract to land the first woman and first person of color on the moon in the mid-2020s as part of the Artemis program.

Accepted designs will be capable of transporting astronauts and equipment between the moon-orbiting Gateway station and the lunar surface as part of NASA’s long-term goal to create a sustainable human presence on the moon, with a view toward using the base as a steppingstone for the first crewed mission to Mars.

Read more
NASA’s massive new moon rocket arrives at launch pad
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher.

NASA's next-generation rocket system, designed to carry spacecraft to the moon as part of the Artemis mission, has arrived at its launch pad for the first time. The Space Launch System (SLS), standing at 212 feet tall, arrived at Launch Pad 39B at the agency’s Kennedy Space Center in Florida on Friday, March 18, following a 10.5-hour journey from its assembly building.

The rocket was topped with the Orion spacecraft, ready for testing before the uncrewed Artemis I mission to the moon. Subsequent Artemis missions will be crewed, with the aim to put humans back on the moon by 2025. “From this sacred and historical place, humanity will soon embark on a new era of exploration,” said NASA administrator Bill Nelson in a statement. “Artemis I will demonstrate NASA’s commitment and capacity to extend humanity’s presence on the Moon -- and beyond.”

Read more