Skip to main content

NASA sets new date for first launchpad test of its mega moon rocket

NASA will have a third go at conducting a launchpad test of its next-generation moon rocket at the Kennedy Space Center in Florida on Saturday, April 9.

This is despite the emergence of another technical issue that NASA is now working to resolve.

NASA's mega moon rocket on the launchpad at the Kennedy Space Center.
NASA’s next-generation “mega moon rocket” on the launchpad at Kennedy Space Center in Florida. NASA / NASA

Two previous attempts over the past week to begin the so-called “wet dress rehearsal” were called off due to the discovery of technical problems, the first one due to a fan issue linked to the rocket’s mobile launcher, and the second due to a stuck valve on ground equipment at the pad.

Recommended Videos

On Thursday, NASA reported the discovery of another issue, this time regarding helium purge pressure on the upper stage engine. After a troubleshooting process, engineers managed to establish a normal helium purge, but they’re continuing to investigate what caused the issue.

Please enable Javascript to view this content

All being well, the two-day wet dress rehearsal will begin at the Kennedy Space Center on Saturday at 2:40 p.m. ET.

The exercise will involve NASA engineers filling the powerful Space Launch System (SLS) rocket with fuel before conducting a mock countdown.

If all goes to plan and no more technical issues appear, NASA will be able to prepare for the first launch of the SLS rocket and Orion spacecraft, hopefully in the next couple of months.

The uncrewed Artemis I mission will send Orion on a fly-by of the moon in a comprehensive test of its spaceflight systems. Artemis II will fly the same route but with a crew on board, while the highly anticipated Artemis III mission, currently slated for no earlier than 2024, will put the first woman and first person of color on the lunar surface.

It looks like NASA needs to catch a break with the long-awaited launchpad test of its next-generation rocket. Alongside the technical issues of recent days, the date for the first test attempt also had to be rescheduled after four lightning strikes hit the launchpad’s lightning towers.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
Watch NASA’s SLS rocket take one small step toward the Artemis II moon mission
The core stage of NASA's SLS rocket.

Artemis II Core Stage Moves to High Bay 2

Although it won’t be blasting off until mid-2026 at the earliest, preparations are already well underway for the launch of NASA’s highly anticipated Artemis II mission.

Read more
SpaceX video shows awesome power of Starship rocket in new fire test
SpaceX tests its Super Heavy booster ahead of the Starship's seventh flight test.

SpaceX has performed a static fire test of the mighty Super Heavy booster ahead of the seventh test flight of the Starship rocket. Secured firmly to the ground, the rocket’s 33 Raptor engines fired for about 18 seconds before coming to a halt.

The Super Heavy booster, which forms the first stage of the Starship rocket, generates an incredible 17 million pounds of thrust at launch, making it the most powerful rocket ever to fly.

Read more
NASA pushes back its Artemis moon missions due to heat shield issues
The Orion crew module for NASA’s Artemis II mission.

NASA has announced that it is delaying its ambitious Artemis II and Artemis III missions, which will see astronauts travel around and then land on the moon for the first time in over 50 years. The missions will be pushed to April 2026 and mid-2027 respectively, which is around six months later than previously planned.

The delay is due to problems with the Orion spacecraft's heat shield. Orion is the capsule in which crew members for each mission will travel, and it must withstand temperatures of nearly 5,000 degrees Fahrenheit during re-entry through the Earth's atmosphere. On the previous Artemis I mission in 2022, the Orion capsule was used in an uncrewed test and fared generally well, completing the mission as planned.

Read more